Abstract:Taking the Huxindao Wetland Park in Zhengguo Town, Zengcheng District, Guangzhou City as an example, the impact of water intake project construction on the ecological environment of the park during the construction period and operation period is evaluated. Based on field investigation of natural conditions, biological resources, and ecological environment within the evaluation scope, the evaluation is carried out objectively, scientifically, and comprehensively from five aspects: land resources, wetland waters, vegetation and plant diversity, wildlife diversity and habitat, and main ecological factors. The results show that the water intake relocation project of Kedengshan Water Works occupies a small area of the wetland park. The ecological environment of the park will be slightly affected by means of proper ecological protection and restoration measures during the construction and operation periods, which is within the controllable range. Finally, suggestions are provided for measures to protect the environment, vegetation, and animals during the construction and operation periods of the project.